Construction Cost Estimating Software vs. Spreadsheets State of the Nation 2012

While accurate, timely, and transparent cost estimating is critical to the success of any renovation, repair, sustainability, or new construction project, most construction cost estimators (over 55%) continue to rely primarily upon manual methods, hard copy documents, or electronic spreadsheets such as Microsoft Excel. Lack of robust business processes, management practices, proper education and training, [...]

Read full story Comments { 0 }

“We can’t solve problems by using the same kind of thinking we used when we created them.” – Albert Einstein

It’s amazing how many cost estimators exclusively use spreadsheets. In end, this practice creates more problems than it solves. Certainly spreadsheets play an important role, however, study after study has proven them to be inefficient and prone to error when collaboration is required, or when relatively sophisticated databases are commonly used. The solution for Owners, [...]

Read full story Comments { 0 }

Unit Price Books (UPBs ) for JOC and SABER

Unit price books are unit price-based cost databases referenced by a particular JOC or SABER contract. In some cases UPBs can be task-based; however, this method doesn’t provide a level of detail consistent with the practices of most construction cost estimators. RSMeans is used in the majority of JOC contracts in the United States (over [...]

Read full story Comments { 0 }

Project delivery methods play a critical role in cost effective facility asset management

Traditional methods such as design-bid-build and even “newer” methods such as design-build are not fully collaborative. The net result is information is not shared by all parties and adversarial components of these methods typically lead to mistrust and waste. Integrated project delivery (IPD) and Job order contracting (JOC), the later also referred to as “IPD-lite” [...]

Read full story Comments { 0 }

More About Coefficients….

What is a coefficient? A multiplier? A factor? These terms describe a number which is applied to the unit price book (UPB) to arrive at the contractual cost for JOC / SABER construction projects. A coefficient of 1.08 means that the contractor will perform each and every line item in the unit price book for [...]

Read full story Comments { 0 }

Coefficients and their role in Job Order Contracting (JOC) and SABER

Price coefficients are applied to unit line prices from a unit price book (UPB) to determine the actual cost of JOC or SABER project and/or task order. The contracted price coefficient is applied to all labor and materials line items necessary for each job to arrive at an estimated for the job. Coefficients are important [...]

Read full story Comments { 0 }

JOC, SABER – IPD that works.

Job Order Contracting (JOC), and Simplified Acquisition of Base Engineering Requirements (SABER) are both forms of Integrated Project Delivery (IPD). They are collaborative, transparent, performance-based construction delivery methods that significantly improve productivity vs. traditional design-bid-build. Procurement and project timelines are decreased, change orders are virtually non-existent, and longer term relationships exist between Owners, Contractors and [...]

Read full story Comments { 0 }

4Clicks Regional Training Class – Las Vegas, NV – March 14th and March 15th, 2012

Owners, Contractors and Subcontractors, 4Clicks is hosting an upcoming Regional Training Class in Las Vegas, and we’d like to invite you and your team to attend! This two day class is perfect for brand new e4Clicks Project Estimator users and those who could benefit from a refresher course. A great chance to sharpen your estimating [...]

Read full story Comments { 0 }

e4Clicks Project Estimator Regional Training – Atlanta, GA – February 15th -16th, 2012

Reminder to reserve your space before it’s too late! Great if you are new to using e4Clicks for JOC, SABER, IDIQ, SATOC and MATOC projects and RSMeans Cost Data, or simply need a refresher course. Join your fellow estimators, contractors, A/E’s, and contracting professionals for a hands-on and FUN two days of training. Our “teachers” [...]

Read full story Comments { 0 }

Performance-Based Service and FAR

Is a Maintenance and Repair under a JOC contract, and/or construction considered “Performance Based Service” or does it have its own category in terms of the FAR interpretation? Administering task orders on an IDIQ Job Order Contract for Maintenance and Repairs should always include appropriate legal review, and we are not qualified to offer, nor [...]

Read full story Comments { 0 }